Project Description

  • New 100 to 150 GPM Extraction Well, Equipping, Mag Meter, Electrical Improvements and Gate Valves
  • 2,000 LF of Transmission Pipe
  • Treatment of the 3 Groundwater Extraction Wells, which Contained the Highest Concentrations of Perchlorate and VOCs
  • Utilized Ex Situ Treatment with LGAC and a Fluidized Bed Reactor for Perchlorate Removal
  • Electrical Upgrades, Instrumentation, Controls and Appurtenant Piping