Project Description
(Photo is pre-construction)
- New Pump Station Will Allow VCWP to Provide Stable Pressures and Enable Better Fire Flow and Fire Protection Demands
- Designed New Booster Pump Station with Six Vertical Can Pumps Driven by 125 HP Motors and VFDs
- Designed Turbine Pumps, Pump Cans, and Steel Piping to Divert Treated Water to On-Site Reservoirs
- Designed Butterfly Valves, Check Valves, a Surge Valve, a Flow Meter, Concrete Vaults and Diesel Generator for Backup Emergency Power
- Watch a live feed of the construction work here: