Project Description

  • Preliminary Basis of Design Report of 3 Sites
  • Designed the Desalter Treatment Plant to Develop a Brackish Groundwater Treatment System
  • The Facility Pumps and Treats Approximately 9,000-AFY using Reverse Osmosis, with the ability to Safely Increase Demand to 12,800 AFY
  • Chloride Concentrates from Desalination are Discharged into the Calleguas SMP