Project Description

  • 2,200 GPM Lift Station Minimized Impacts to the Influent Headworks Screens and Grit System by Diverting Flow to the Equalization Basin through Newly Installed Main Line (to avoid shut down of the system)
  • 500,000-gallon Lined Basin Was Strategically Configured to Encourage Self-Washing and Cleaning During Normal Operation
  • Flow is Introduced to the Basin by Gravity, Filling During the Day and Ultimately Draining through the Night
  • New Pumps Operated on a Variable Target Speed to Consistently Pace Delivery of Flow to the Downstream Process
  • Improvements Included Yard Piping, Grading and Drainage, and Electrical Controls and Power Supply
  • Fast Tracked and Built Ahead of Schedule with Minimal Change Order Impacts