Project Description
- Designed a New Automatic Digester Gas Direct Feed Valve with Associated Controls
- Performed an Evaluation of the Existing Digester Gas Collection System
- Paved the Flare System Area
- System Improvements Minimize the Release of Digester Gas to the Atmosphere when Gas Production Exceeds the Capacity of the Existing Fuel Cell and Boiler Systems