Project Description

  • Designed a New Automatic Digester Gas Direct Feed Valve with Associated Controls
  • Performed an Evaluation of the Existing Digester Gas Collection System
  • Paved the Flare System Area
  • System Improvements Minimize the Release of Digester Gas to the Atmosphere when Gas Production Exceeds the Capacity of the Existing Fuel Cell and Boiler Systems