Project Description

  • Analysis and Rehabilitation of Existing Pipe Trestle
  • 9,500 LF of 8-inch HDPE and 640 LF of 8-inch steel pipe
  • 450 GPM, 50 Horsepower Pump Station with Block Wall Building
  • Controls, Communication System and Electrical
  • Connection to a New Metering Station (designed by Civiltec under another project)