Prescott Municipal Airport – Runway Safety Improvements

Civil Engineering Prescott Municipal Airport

Civiltec was directly responsible for the following design and analyses:

  • Approximately 8,000 linear feet of 36″ – 78″ storm drain
  • 25 storm drain junction structures

Civiltec performed the following survey and post design services:

  • All survey control and design survey for the lengthening of Runway 3R-21L
  • The survey included approximately 49,000 field observations
  • Ground control services for both high altitude and low altitude aerial imagery
  • Base map preparation for the project
  • Airspace analysis data per FAA guidelines and Advisory Circulars
  • FAA project submittal using online AGIS submittal system
  • Construction inspection and survey quality control checks per FAA guidelines

Prescott Municipal Airport - Runway Safety Improvements