Chino Meadows Drainage Mitigation

Chino meadows

This project was funded using CDBG (Community Development Block Grant) funds for sub-economic areas.  This included the use of federal funds, which required environmental clearances, Davis Bacon Wages, full site surveying, public awareness campaign (public meeting), etc.

Civiltec was directly responsible for the following design and analyses:

  • Hydrologic and hydraulic analysis
  • Debris/de-silting basin design
  • Three stage hydraulic inlet
  • Design of 800 feet of 36″ diameter storm drain with various side inlets
  • Design of a single 12’x9′ reinforced concrete box culvert under Road 1 North capable of conveying 800 cfs (100 year event passing under road)
  • 100% plans, specifications, and cost estimates

Civiltec performed the following post-design services:

  • Construction management
  • Submittal reviews
  • Pay request reviews
  • Inspection