Home Locations Services Projects Careers
Northern Water Main Extension Project

Project Type: Water Engineering

This project included the design and production of approximately 16,000 lineal feet or three miles of 12” Ductile Iron water main to loop the Town of Prescott Valley’s water system including the future connection of 6 new well sites.  Coordination with municipalities and agencies for all approvals to construct and to operate facilities, including part time construction observation, and as-built information for entire project.   Civiltec also coordinated with APS and the Town for power needs and provided APS with the design location for conduit, transformers and junction boxes.

 
 

Contact Us              Links

Copyright © 2007 Civiltec Engineering, Inc.