Project Type: Water Engineering This project was a design build with FANN Contracting for a booster station that pumps approximately 3,000 gallons per minute (gpm) from the proposed North Well Field and existing Viewpoint reservoir tanks located in a Town of Prescott Valley municipal water pressure zone to the existing Jane, Peggy and Victoria reservoir tanks located in a Prescott Valley Water District water pressure zone. The project also included the coordination with the Town and owner for easement acquisition for the location of the Booster Station. Lastly, the project included coordination with APS for power including the location for Transformers and switching cabinets supplied to APS for their design. |